TRANE 5 Ton AC / Air Handler 16 SEER

$9,394.00 Complete system with installation (TAX included)

Pay after installation

-

Matched system provides high energy efficiency with reliable single stage cooling and electric strips for heating. Precision temperature and quiet operation provided by variable speed blower motor. Certificate AHRI 8858424, Actual SEER 16

Out of stock

SKU: 50XL16iTEM6EH Category:

Description

Air Conditioner TRANE 4TTX6061J1000 – XL16i series, 16 SEER
-Durable Climatuff® compressor
-Full-side louvered panels
-WeatherGuard™ II top
-Baked-on powder paint
-Corrosion-resistant Weatherguard™ fasteners
-All-aluminum Spine Fin™ outdoor coil
-DuraTuff™ non-corrosive base pan
-Unique mounting of shaft down fan motor
-Variable-speed fan motor
-Quick-Sess cabinet with full coil protection

Air Handler Unit TRANE TEM6A0C60H51S – TEM6 series Multi-Position Air Handler
– Variable speed blower motor
– Comfort-R humidity control
– 4-way convertible line
– Galvanized steel cabinet
– Electric heat
– All-aluminum coil
– No-rust polymer drain pan

Electric Heater TRANE BAYHTR1523BRK – Heat Strip Electric heater 20 KW

Thermostat

Communicating thermostat is not required. Can be used existing one if it fits to a new system requirement.

Warranty on equipment/works – according to manufacturer’s/contractor’s term and conditions.

Trane Extended Limited Warranty:
– 10 years on coil and functional parts
– 12 years on compressor

Warranty on installation works – 12 month

All necessary materials that must be replaced to keep your new AC system running efficiently and safety and to pass a city inspection

Service works:
– City Permit

Professional installation works in accordance with mechanical city code:
– Remove and recycle existing equipment, cleanup site when finished
– Customer flooring protected with drop clothes
– Existing refrigerant recovered and recycled in accordance with the clean air act
– Installation of new system units
– Exterior section of refrigerant line insulation replaced with exterior-grade pipe insulation
– Copper refrigerant lines vacuumed and filter drier installed to prevent moisture damage
– Connecting to existing ductwork
– all necessary connection to existing communication lines (electricity, gas and flue pipe)
– Thermostat wiring connection
– Condensate line connection to existing drainage with proper P-trap and cleaning access
– All seams between equipment, platform and ductwork sealed airtight
– Adjust refrigerant charge and blower speed to provide optimal performance