TRANE 3 Ton AC / Gas Furnace 16 SEER2

$11,193.00 Complete system with installation (TAX included)

Pay after installation

-

Matched system provides advanced energy efficiency and comfort with two-stage cooling and heating. Precision temperature and quiet operation provided by exclusive patented Vortica™ II blower design. Actual SEER2 – 16, AHRI 210855898

SKU: 30XR16S8X24TXC Category:

Description

Air Conditioner TRANE 4TTR6036N1000 – XR16 series, Two Stage, 16 SEER
– Two-Stage Climatuff compressor
– Spine Fin outdoor coil
– Upgraded fan motor
– Full-Side louvered panels protect your investment
– Corrosion-resistant Weatherguard™ fasteners
– Unique DuraTuff™ non-corrosive base pan
– Quick-Sess cabinet with full coil protection

Gas Furnace Gas Furnace TRANE S8X2B060M4PSC – S8X2 series Gas Furnace, 80% AFUE, Two Stage, Constant Torque
– Two-stage gas heat
– Constant Torque ECM blower motor
– Self-diagnostic microelectronic control
– exclusive patented Vortica™ II blower design
– Multi-port, in-shot burners
– One-piece heat exchanger
– Insulated cabinet for quiet operation

Evaporator Coil TRANE 4TXCB006DS3HCA – 4TXC-DS Aluminum High Efficiency Stage System Coil
– All Aluminum Construction
– Leak Tested
– Cleaned Coils
– Factory Installed TXV
– Foil Backed Insulation
– Noncorrosive Drain Pan
– Painted Finish

Thermostat

Communicating thermostat is not required. Can be used existing one if it fits to a new system requirement.

Warranty on equipment/works – according to manufacturer’s/contractor’s term and conditions.

Trane Extended Limited Warranty:
– 10 years on coil and functional parts
– Life time on heat exchanger
– 10 years on compressor

Warranty on installation works – 12 month

All necessary materials that must be replaced to keep your new AC system running efficiently and safety and to pass a city inspection

Service works:
– City Permit

Professional installation works in accordance with mechanical city code:
– Remove and recycle existing equipment, cleanup site when finished
– Customer flooring protected with drop clothes
– Existing refrigerant recovered and recycled in accordance with the clean air act
– Installation of new system units
– Exterior section of refrigerant line insulation replaced with exterior-grade pipe insulation
– Copper refrigerant lines vacuumed and filter drier installed to prevent moisture damage
– Connecting to existing ductwork
– all necessary connection to existing communication lines (electricity, gas and flue pipe)
– Thermostat wiring connection
– Condensate line connection to existing drainage with proper P-trap and cleaning access
– All seams between equipment, platform and ductwork sealed airtight
– Adjust refrigerant charge and blower speed to provide optimal performance