TRANE 2 Ton Heat-Pump / Air Handler 17 SEER

$9,464.00 Complete system with installation (TAX included)
Pay after installation

Matched system provides advanced energy efficiency and comfort thru two stage cooling and heating. Precision temperature and quiet operation provided by variable speed blower motor. Certificate AHRI 10093555, Actual SEER 17

Out of stock

SKU: 20XL18iTAM9EH
Category:

Description

Heat-Pump TRANE 4TWX8024A1000 – XL18i series 18 SEER Two Stage
– Two-stage Climatuff® compressor
– Full-side louvered panels
– WeatherGuard™ top protects components
– Baked-on powder paint
– Corrosion-resistant Weatherguard™ fasteners
– Spine Fin™ outdoor coil
– Unique DuraTuff™ non-corrosive basepan
– Unique mounting of shaft down fan motor
– Variable-speed fan motor
– Low-resistance airflow

Air Handler Unit TRANE TAM9A0B30V31D – TAM9 series Communicating Variable Speed Air Handler
– Uniquely designed cabinet
– Fully enclosed insulation
– All-aluminum coil
– Variable-speed Vortica™ blower motor
– Unique modular design
– Electronic expansion valve metering device that is 400% more reliable than standard expansion valves
– “No leak” drain pan made from rust-resistant composites and built with a gradual slope
– Electric heat
– Corrosion-resistant finish
– ComfortLink™ II communicating technology (on select models)

Electric Heater TRANE BAYEAAC08BK1B – Heat Strip Electric heater 8 KW

Thermostat

Communicating thermostat is not required. Can be used existing one if it fits to a new system requirement.

Warranty on equipment/works – according to manufacturer’s/contractor’s term and conditions.

Trane Extended Limited Warranty:
– 10 years on coil and functional parts
– 12 years on compressor

Warranty on installation works – 12 month

All necessary materials that must be replaced to keep your new AC system running efficiently and safety and to pass a city inspection

Service works:
– City Permit

Professional installation works in accordance with mechanical city code:
– Remove and recycle existing equipment, cleanup site when finished
– Customer flooring protected with drop clothes
– Existing refrigerant recovered and recycled in accordance with the clean air act
– Installation of new system units
– Exterior section of refrigerant line insulation replaced with exterior-grade pipe insulation
– Copper refrigerant lines vacuumed and filter drier installed to prevent moisture damage
– Connecting to existing ductwork
– all necessary connection to existing communication lines (electricity, gas and flue pipe)
– Thermostat wiring connection
– Condensate line connection to existing drainage with proper P-trap and cleaning access
– All seams between equipment, platform and ductwork sealed airtight
– Adjust refrigerant charge and blower speed to provide optimal performance

AHU type: Upflow/Horizontal

Condenser unit location: Ground

Flow direction location: Upflow

Heat source: Electric

HP / AC: Heat-Pump

Tonnage: 1.5, 2